{"id":4155,"date":"2024-01-24T21:13:01","date_gmt":"2024-01-24T21:13:01","guid":{"rendered":"https:\/\/dmcat.austincc.edu\/bct\/?page_id=4155"},"modified":"2024-01-24T21:13:18","modified_gmt":"2024-01-24T21:13:18","slug":"cnbt-1359-project-scheduling","status":"publish","type":"page","link":"https:\/\/dmcat.austincc.edu\/bct\/cnbt-1359-project-scheduling\/","title":{"rendered":"CNBT 1359 Project Scheduling"},"content":{"rendered":"<p>Prerequisites:<\/p>\n<ul>\n<li><a title=\"CNBT 1402 Mechanical, Plumbing and Electrical Systems\" href=\"https:\/\/dmcat.austincc.edu\/bct\/cnbt-1402-mechanical-plumbing-and-electrical-systems\/\">CNBT 1402 Mechanical, Plumbing and Electrical Systems<\/a><\/li>\n<li><a title=\"CNBT 1411 Construction Methods and Materials\" href=\"https:\/\/dmcat.austincc.edu\/bct\/cnbt-1411-construction-methods-and-materials\/\">CNBT 1411 Construction Methods and Materials I<\/a><\/li>\n<li><a title=\"CNBT 1413 Concrete I\" href=\"https:\/\/dmcat.austincc.edu\/bct\/cnbt-1413-concrete-i\/\">CNBT 1413 Concrete I<\/a><\/li>\n<li><a title=\"CRPT 1415 Conventional Wall Systems\" href=\"https:\/\/dmcat.austincc.edu\/bct\/crpt-1415-conventional-wall-systems\/\">CRPT 1415 Conventional Wall Systems<\/a><\/li>\n<\/ul>\n<p>or department approval<\/p>\n<p class=\"bodytext\">A study of conventional scheduling using critical-path-method; precedence networks; bar charts; monthly reports; and fast track scheduling.<\/p>\n<p class=\"bodytext\">Students learn to understand and apply the available methods of project scheduling, including the sequence of different construction processes as well as formulating and diagramming schedules.<\/p>\n<p class=\"bodytext\">Students learn the stages of a project (planning, sequencing, scheduling) and various ways of tracking the progress of the project. Students also learn how to monitor projects and how to manage the changes and complications.<\/p>\n<p><a href=\"http:\/\/www6.austincc.edu\/schedule\/\">Course syllabus is available on the current semester\u2019s schedule page<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prerequisites: CNBT 1402 Mechanical, Plumbing and Electrical Systems CNBT 1411 Construction Methods and Materials I CNBT 1413 Concrete I CRPT 1415 Conventional Wall Systems or department approval A study of conventional scheduling using critical-path-method; precedence networks; bar charts; monthly reports; and fast track scheduling. Students learn to understand and apply the available methods of project [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-4155","page","type-page","status-publish","hentry"],"acf":{"featured_banner":false,"layouts":false,"hero_content":false,"sidekick":""},"_links":{"self":[{"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/pages\/4155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/comments?post=4155"}],"version-history":[{"count":0,"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/pages\/4155\/revisions"}],"wp:attachment":[{"href":"https:\/\/dmcat.austincc.edu\/bct\/wp-json\/wp\/v2\/media?parent=4155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}